📞 +86 13603039927 ✉️ evelyn@szheatmate.cn
ISO & CE/ETL Certified Factory · Direct OEM & ODM Supplier
NBS-HB-24001

Washable USB Heated Fleece Socks for Men and Women

Professional Factory | Reliable Quality | Stable Supply

FABRIC 100% Polyester
COLOR
SIZE
QUANTITY
MOQ 500 pcs per model
OEM / ODM Available Custom label, hang tag, packaging
Lead Time 30 – 45 days
Global Delivery Reliable logistics worldwide
Description

These USB heated fleece socks combine soft polyester fabric with adjustable electric warmth to keep feet comfortable during cold weather. The 5V/2A USB power connection is compatible with common power banks and USB adapters, while the lightweight, anti-static and washable design is suitable for indoor relaxation, travel and winter use. HEATMATE supports OEM and ODM customization, including size, color, heating system, logo, labels and retail packaging.

Product Description Product Description Product Description Product Description Product Description
Product Name USB Heated Fleece Socks
Color Beige or Customized
Size 25 × 21 cm / Customized
Weight 1.5kg
Fabric Polyester/Customized
Power 8–12W
Voltage 5V/2A
Power supply USB Interface
Warranty 1 Year
Certification RoHS / CE / FCC / UKCA / PSE / UL

Related News

Frequently Asked Questions

Q1: Can you customize this product?

Yes. We support OEM and ODM customization, including material, size, color, heating system, temperature settings, controller, logo, labels and retail packaging.

Q2: What is your minimum order quantity?

The standard MOQ usually starts from 500 pieces per model. The final MOQ depends on the product type, material, heating configuration and packaging requirements.

Q3: Can I order a sample before mass production?

Yes. Samples are available for quality and function evaluation. Standard samples normally take 3–5 days, while customized samples may require 7–15 days.

Q4: What certifications are available?

Depending on the product configuration and destination market, we can support CE, RoHS, FCC, UKCA, ETL, PSE and UL-related certification requirements. Please contact us to confirm certification availability for your selected model.

Q5: What is the production lead time?

Mass production normally takes approximately 30–45 days after sample approval and order confirmation. The actual lead time depends on the quantity and customization requirements.

Q6: How do you ensure product quality?

Our quality control covers raw materials, heating performance, temperature stability, electrical safety, appearance and packaging. Products are inspected and tested before shipment.

MOQ from 500 PCS Flexible for your business
Global Delivery Reliable logistics worldwide
Custom Solutions OEM / ODM available
Quality Guarantee Built to last