📞 +86 13603039927 ✉️ evelyn@szheatmate.cn
ISO & CE/ETL Certified Factory · Direct OEM & ODM Supplier
NBS-HB-24001

Electric Heated Blanket with Adjustable Heat Settings and Timer

Electric Heated Blanket

FABRIC Fleece+Wool
COLOR
SIZE
QUANTITY
MOQ 500 pcs per model
OEM / ODM Available Custom label, hang tag, packaging
Lead Time 30 – 45 days
Global Delivery Reliable logistics worldwide
Description

Washable Design: Easy care and reusable for long-term use. Temperature Control: Precise heat regulation for comfort. Anti-Static Fabric: Keeps you comfortable and prevents static buildup. Soft Fleece Material: Provides warmth and coziness for a restful night. Multiple Settings: 12 temperature levels and timer options for personalized comfort.

Product Description Product Description Product Description Product Description Product Description Product Description
Product Name Fleece+Wool Electric Heated Blanket
Color Gray/Customized
Size 50 × 60 in / 62 × 84 in / 72 × 84 in / 84 × 90 in / 100 × 90 in / Customized
Fabric Fleece+Wool
Power 200W
Heating Levels 91.4-131℉
Timer 1/2/4/6/8/10/12H
Controller 1-12 temperature settings 1-12 hours timer
Package color box/vacuum+color box/Customized
Certification CE / RoHS / FCC / PSE / UL / UKCA

Related News

Frequently Asked Questions

Q1: Can you customize this product?

Yes. We support OEM and ODM customization, including material, size, color, heating system, temperature settings, controller, logo, labels and retail packaging.

Q2: What is your minimum order quantity?

The standard MOQ usually starts from 500 pieces per model. The final MOQ depends on the product type, material, heating configuration and packaging requirements.

Q3: Can I order a sample before mass production?

Yes. Samples are available for quality and function evaluation. Standard samples normally take 3–5 days, while customized samples may require 7–15 days.

Q4: What certifications are available?

Depending on the product configuration and destination market, we can support CE, RoHS, FCC, UKCA, ETL, PSE and UL-related certification requirements. Please contact us to confirm certification availability for your selected model.

Q5: What is the production lead time?

Mass production normally takes approximately 30–45 days after sample approval and order confirmation. The actual lead time depends on the quantity and customization requirements.

Q6: How do you ensure product quality?

Our quality control covers raw materials, heating performance, temperature stability, electrical safety, appearance and packaging. Products are inspected and tested before shipment.

MOQ from 500 PCS Flexible for your business
Global Delivery Reliable logistics worldwide
Custom Solutions OEM / ODM available
Quality Guarantee Built to last